Straight to the content
RetainerWorth

Client retainer increases: 2 ways to set the raise

Raise a client retainer by a fixed dollar amount or a percentage, after checking the service, previous raise and work trend.

Key takeaways

  • Before you touch the number, be clear about what the retainer buys.
  • Use a fixed dollar step when the work has stayed flat and the client values a predictable bill.
  • Use a percentage step when the work has grown along with the retainer, since the increase tracks the base.
  • If the work has grown faster than the retainer, review the scope with the client before any raise.
  • Show the client the next few figures before you confirm, so the compounding is visible from the start.

The client's retainer is due for its refresh, and the number on the page has to move. Both methods are easy to write down. In the examples below, both methods reach 1100 after the first raise, then reach 1200 and 1210 at the next refresh.

This post is a decision path. Work through the checks first. Each answer points you toward one method, and the later sections give worked figures for both methods so you can compare them before you change the amount. If you refresh on a set schedule, the same path works for every refresh, so it is worth recording the result once and reusing it.

Confirm what the retainer pays for

A retainer can be a prepaid block that covers a set amount of work, a standing fee that holds the client's place in your schedule, or something in between. The two methods answer to different things, so the first question is which one you are pricing. For help distinguishing them, see retainer fee types.

Write one plain sentence that says what the client receives for the current amount. For example: "The client gets a set number of hours of advisory work each month, with first call on urgent requests." If you cannot write that sentence, the retainer probably needs review before any raise. A raise on an unclear service is hard to defend, whichever method you use.

Next, check how unused balance is handled. Some firms let unused amounts roll into the next period, and others do not. Confirm the terms in your own engagement letter or client agreement before you change anything. A carried balance changes what a raise costs the client in practice, because the client may already have money set aside that covers part of the new amount. Do not assume the answer is the same for every client on your list.

Check the last raise and the period length

Pull three figures from the client file: the current retainer, the size and type of the last raise, and the length of the budget period. The type of the last raise matters most. If the last change was a fixed dollar step, the next one should usually be a fixed step too. Treat a previous percentage raise as a reference point; a change in the work trend or scope can justify switching methods. Switching methods every period makes the bill hard for the client to predict and makes the history hard to audit.

If there was no previous raise, that is also information. The retainer has probably been flat for a while, which means a single catch-up raise could be large. In that case, look at whether the retainer has drifted below what the work now costs before you pick a method. A fixed step can close a gap gradually, but only if the gap is small enough that the step can close it over a few periods.

Then look at the period length. A refresh every month produces twelve raises a year, and a refresh every quarter produces four. The same percentage or the same step moves the number much faster on a monthly schedule, because there are more refreshes to stack. Choose the method with the number of refreshes you actually plan to run in view, not just the next one. Writing the planned number of refreshes beside the figures makes the comparison concrete. A method that looks gentle for one refresh can look steep across eight, and the only way to see that is to count ahead.

Also note whether the client's contract ties the retainer to a fixed term or runs it open-ended. A fixed term has a natural end, and the last refresh should be planned against it. An open-ended retainer needs a review date instead, so the amount is looked at on a schedule even when nothing else has changed. For related scheduling checks, see phased retainer schedules.

Check whether the work has grown

Look at actual use over the last two or three budget periods. Count hours, requests, or whatever measure your office uses for the work. Then compare the trend in use with the trend in the retainer.

If the work has stayed flat while the retainer climbed, the client is paying more for the same thing. A fixed step is easier to explain in that case, because it states a plain amount without tying the increase to a base the client may not see as relevant. If the work has grown along with the retainer, a percentage fits, because the increase follows the base and the retainer keeps its relationship to the work.

When the answers point in different directions, trust the use data over your sense of the account. Accounts feel stable or strained for reasons that do not show up in the numbers, and a raise chosen on a feeling is harder to explain later than one chosen on counted hours.

If the work has grown faster than the retainer, neither method closes the gap on its own. The retainer is already too low for the use, and a raise of either kind will only make the mismatch slower to show. Agree on what the retainer covers now, and only then choose a method for the new amount.

Method 1: raise by a fixed dollar step

A fixed step adds the same amount every period. The arithmetic is as simple as it gets. The Zoho Books budget guide uses the same mechanic for budgets: if the first period's amount is set at 1000 and the adjustment for each period is 100, the amounts are 1000 for the first period, 1100 for the second, 1200 for the third, and so on.

The client can see the exact figure for the next period without doing any arithmetic, and you can explain it in one sentence. That clarity is most of the benefit.

The trade-off is that the step stays the same size while the base grows. A 100 step on a 1000 retainer is a 10 percent increase. The same 100 step on the 1100 amount is a little over 9 percent. Nothing is wrong with that, but if you want each rise to look like a steady percentage, this method will not produce it. Decide that before you start, not after the client asks why the increases look smaller over time.

To set this up, choose the step amount first, then compute each new figure from the current one. Write the step on the client record so the next refresh uses the same rule without another discussion.

Method 2: raise by a percentage step

A percentage step multiplies the current amount by a fixed rate each period. The same Zoho Books budget guide shows this mechanic too. With a first-period amount of 1000 and an adjustment of 10 percent, the amounts are 1000 for the first period, 1100 for the second, and 1210 for the third, and so on. The third figure is 1210, not 1200, because the second increase is calculated on 1100.

It also means a larger retainer gets a larger raise, which many clients accept as fair, provided they can see the logic behind it.

The trade-off is that the increase grows each period. Over a long run, a percentage can produce a figure that surprises the client, especially if the last raise was small and the next one is noticeably larger.

A percentage also behaves differently across clients. On a small base, the same rate produces a small step, and on a large base it produces a large one. If your retainers vary widely, a single rate applied across the whole book can look generous on one account and heavy on another. Check each client's base separately rather than applying one rate everywhere.

Run both methods for three periods

Take the real current amount and run both methods for three periods, using the same arithmetic as the examples above. Put the results side by side in a spreadsheet or on paper. Do not do this in your head, because the difference after one period is small enough to miss, and the difference after three is the one the client will see.

Read the three figures out loud and ask whether you could explain each one. If the fixed step gives numbers you can defend and the percentage gives numbers you would have to justify, use the fixed step. If the reverse is true, use the percentage. If both feel right, pick the one that matches what the work did in the most recent period, because that is the freshest evidence you have.

Settle the rounding before the first refresh. The Zoho examples use whole numbers, but your billing system may round to cents or to whole units, and a percentage can produce fractions that round differently from a fixed step. Decide the rounding rule once, write it down, and apply it to every client on the same method. That way two clients with the same base do not end up with different figures for no reason.

Also decide the effective date of the new figure, meaning whether it starts at the beginning of the period or at the first invoice after the refresh. Put that date on the same page as the figures.

Illustrative example: check a fixed step

Start with an illustrative retainer of 1000 and a fixed step of 100. After the first refresh, the amount is 1100. After the next refresh, it is 1200. The added amount stays at 100, even though the base grows. Check whether those figures fit the work before choosing the step.

Decide what happens when the schedule shifts

Refresh schedules do not always run cleanly. A client may pause the service for a month, ask to move the refresh date, or add a second service partway through a period. Each of these can make the next raise look wrong even when the method is right, so decide the rule for these cases before they happen.

For a pause, choose one of two approaches and apply it to everyone. You can hold the amount where it is and refresh on the original date, or you can move the refresh to the day the service restarts. Either works. What causes trouble is handling each pause differently, because then the client compares your choices and finds one they do not like.

For a moved refresh date, keep the step or rate the same and change only the date. Do not recalculate the amount to make up for the shift unless your contract says the amount follows the date. If you do adjust, show the arithmetic so the client can check it. A moved date is a scheduling change, and it should not quietly become a second raise.

For an added service, treat it as a separate line in the engagement rather than a hidden increase in the retainer. If the new service needs more of the existing retainer, say so and review the scope. If it is billed on its own, the retainer raise should still follow the method you chose for the base amount.

Tell the client before the new figure applies

Whichever method you choose, the client should hear about the change before it appears on an invoice. Send the new figure with the reason in one short paragraph. For a fixed step, state the amount and say that it is the same step as last time. For a percentage, state the rate, the new figure, and what the rate was applied to. Clients rarely object to the mechanism itself. They object when a number arrives without an explanation.

Keep the explanation tied to the work. "Your use has grown over the last two budget periods, and the retainer follows that" is more useful than "our prices have gone up." If the work has stayed flat, say so plainly, and explain what the step covers, such as the team time or the service scope that the retainer keeps reserved. Vague reasons invite a negotiation you did not plan for.

Check your engagement terms for how much notice a change needs and whether a change requires the client's written agreement. Those terms come from your own contract and vary by firm, so this post does not set a number for them. Follow what your contract says, and if it is silent, say so internally before you send the notice. Illinois Rule 1.5 on fees says "Any changes in the basis or rate of the fee or expenses shall also be communicated to the client". That is one state's rule for lawyers, so look up the rule or contract terms that apply to your own firm before you decide how and when to tell the client.

Record the rule

Once you pick a method, record the method, the step amount or rate, the base, the next refresh date, rounding and the use-data review in the client file. Future refreshes should follow that record without a fresh decision. A useful entry reads something like this: "Method: fixed step. Step: the same amount as last period. Base: the current retainer. Next refresh: the first day of the next budget period. Rounding: whole units. Reviewed against use data: yes." Each field answers a question someone will ask later, and the last field shows that the checks at the top were actually run. This matters most when a new person takes over the account, because the rule travels with the file rather than living in one person's memory.

If you change methods later, record the reason too. A switch from fixed to percentage, or the reverse, should come from a change in the work or the scope, not from a wish to see a bigger number in one period. A short note that says what changed is enough, and it answers the question a client is most likely to ask later.

Finish each refresh by checking the record against the three checks at the top. If the answers have not moved, the method has not moved. If they have, go back through the path before the next refresh, and let the record show the change.

Today, take one client's current retainer and calculate the next three figures under both methods before choosing which to discuss with the client.

Before you raise the retainer

Can a percentage raise stay the same size?

The rate can stay the same, but the added amount grows as the retainer grows. Compare the actual amounts before confirming the change.

Does a pause require a different rate?

A pause calls for a scheduling decision rather than an automatic rate change. Check the agreement and apply the chosen pause rule consistently.

Related guides: Assess former client information in 4 jurisdictions · Confidential client information: 6 exceptions to check · Client consultation: 4 moments to talk before acting.

Sources