To change a retainer installment, offset any amount increase with reductions elsewhere in the schedule; a date-only change leaves amounts unchanged.

Key takeaways

  • Check the agreed fee and payment history before editing.
  • Keep paid amounts recorded when raising an installment.
  • Reduce later installments by the amount of an increase.
  • Confirm revised dates with the client and include the payment link.

You agree to a fee, split it into parts, and the client starts paying. Then the client asks to change one part: pay more now, pay later, or pay on a different day. The change itself is one number. The trouble is that the rest of the schedule has to move with it, or the invoice stops matching the agreed fee.

This matters more at a small firm than it sounds. Often the same person sets up the schedule and answers the client's questions about it, so the arithmetic and the message have to agree. A retainer is a promise made in pieces, and each piece needs to be right on its own and right in total.

This post walks through two examples from Stripe's documentation on invoice payment plans. The first raises an installment and takes the difference out of later ones. The second moves one due date earlier. Read them as a decision path. First you check a few facts, then you pick the example that matches your change, then you check the result before the client sees it. For the initial schedule, see how to split one fee into installments.

The numbers below are made up for a made-up firm. Stripe's pages know nothing about your engagement letter, your state's rules, or your client, so the arithmetic is the part you can copy directly. The judgment about the client stays with you.

Check these facts before you change anything

Open the invoice, but do not edit it yet. Write down answers to these questions. They decide which path below applies.

  • What total did the client agree to? Take the figure from the signed engagement letter, not from the last invoice or from memory. Every version of the schedule has to add up to that number.

  • What has been paid, installment by installment? Partial payments count. Pull the payment history from your billing records and match each payment to its installment before you change anything.

  • Is the installment already past due? A future installment can be reshaped on paper. A past-due one usually needs a conversation with the client first, and new terms the client has agreed to in writing. A schedule that changes without a word to the client will raise questions, and you are better off answering them before they come up.

  • How is the invoice collected? Stripe's payment method page says: "Invoices and Subscriptions only support the send_invoice collection method" ( Stripe, Payment method support). If your invoice is set up another way, the plan you build may not behave the way these examples describe. Confirm the setup in your Stripe account before you plan any numbers.

  • Do your books run through Stripe's revenue tools? Stripe's payment plan page notes that "Payment plans aren't supported by Stripe Revenue Recognition or the Stripe Connector for NetSuite" ( Stripe, Create invoice payment plans). If you use either tool, decide in advance how you will record each installment outside it, so the books still show the agreed total.

Choose your path

Pick the branch that matches the change you are making. If you are not sure whether an installment is partly paid, the payment history answers that question. A single change can combine two branches, such as raising one installment and moving its date. If it does, make one change at a time and check the total after each.

  • You are raising a partly paid installment. Go to Example 1. The extra amount has to come out of installments that have not come due yet.
  • You are raising an unpaid installment. Go to Example 1 as well; the open-balance step still applies, but the open balance is the full new installment. The total still has to be reduced somewhere else.
  • You are lowering an installment. The same arithmetic runs in reverse. The amount you take off one installment has to land somewhere else in the schedule, or the total falls short. Stripe's example covers the raise case, so test the lower case yourself against the agreed total before you save.
  • You are only moving a due date. Go to Example 2. The amounts stay the same, so no other installment changes.
  • The installment is already past due. Stop and talk to the client. Get the new terms agreed in writing, then come back to this path with the new facts.

Example 1: raise an installment and take the difference from later ones

Illustrative example: increase the deposit

Our made-up firm has a retainer billed as four installments of $1,000 each. The first installment is the deposit, and the client has paid it. Now the firm and the client agree to make the deposit $1,500 instead, because the client would rather pay more up front. The client pays the extra $500 on the deposit, and one later installment comes down by the same $500 so the total does not change.

Stripe describes this exact case. Its example says that "if a customer has only paid a 1,000 USD deposit and you increase that installment to 1,500 USD, it has 500 USD left to collect" ( Stripe, Create invoice payment plans).

That $500 leaves the schedule out of balance. Without a change elsewhere, the schedule would collect $500 more than the agreed fee. Stripe's fix is the one from its own example: "Reduce later installments by a total of 500 USD so that the schedule still matches the invoice total" ( Stripe, Create invoice payment plans). Here are the steps, in order.

  1. Leave the $1,000 payment alone. It was paid, so it stays paid. Do not reverse it or collect it again.
  2. Raise the first installment to $1,500. The installment now shows $500 open, and that open balance is what the client still owes on it.
  3. Reduce later installments by $500 in total. Take the whole amount from the last installment, which drops from $1,000 to $500. Installments two and three stay at $1,000.
  4. Check the total. The schedule should read $1,500, $1,000, $1,000, and $500. Those add up to the same total as the original four installments of $1,000.
  5. Check the dates, then send the schedule. The due dates should still come in order. Send the client the new amounts, the dates, and the payment link in one written message.

Which later installment absorbs the $500 is your call. Taking it from the last installment keeps the earlier dates the same, which makes the change easier to explain. The total works no matter which later one you pick. Keep the reduction on installments that have not come due yet. If you take it from one that is already due, you have changed a payment the client is expecting to make.

The same steps work when the installment is unpaid. Set it to the new figure, and the open balance is the full installment. You still reduce later installments by the same amount, and you still check the total against the agreement.

Do not mark the installment as complete because it looks mostly paid. The $500 stays open until the client pays it.

Example 2: move one due date earlier

Now a different change. Suppose a firm's retainer is billed as three installments of $1,000 each. The third installment is due 7 days after the invoice is finalized. The client now expects funds to come in sooner and asks to pay that third installment earlier. The amount stays at $1,000.

Stripe's example covers a due date change of this kind: "For example, with a 3-day lead time and an installment due 7 days after finalization, advance to 4 days after finalization" ( Stripe, Create invoice payment plans). The example changes only the date. It does not touch the amount, so no other installment needs to move.

Before you copy the 4-day figure, confirm the lead time your own invoice setup uses. The new date in your schedule depends on the lead time you set, not on the numbers in this post.

Our firm uses the same 7-day and 4-day figures. If your lead time is different, your new date will be different too. Work the date out from your own lead time and the due date on the invoice, then check it against the calendar the client actually has.

Here are the steps.

  1. Confirm the earlier date works for the client. Say the new date to the client before you change anything, and make sure they can actually meet it.
  2. Change only the third installment's due date. The amount stays at $1,000, and the total stays the same.
  3. Check the order of dates. The first and second installments should still fall before the third. A schedule that reads out of sequence invites a question you will have to answer.
  4. Confirm in writing. Send the client the new date, the amount, and the payment link.

Because the amount did not change, this path is simpler than Example 1. Nothing else needs to be re-spread, and the main question is whether the client can meet the date. The earlier date may also collide with a deadline the client already has, so ask about that before you save. If the date moves later instead of earlier, the same steps apply in the same order.

The client's own records will also shift. A client who wrote the old date on a calendar or in a budget needs to hear about the change from you, not discover it when a payment is late. A short message that gives the old date, the new date, and the reason for the move is enough.

If a single change involves both an amount and a date, make the amount change first, check the total, and only then move the date. Two changes at once make it hard to tell which one caused a problem.

What stays the same

Re-spreading changes the schedule, not the agreement. The total fee stays where the engagement letter put it. Payments already received still count toward the fee. The services the firm owes the client do not change because an installment moved.

This matters for how you talk about the change. Describe it as a new payment plan for the same fee, not as a discount, a new price, or a favor. A client who hears the fee changed will ask a different question than a client who hears only the timing changed. If the fee really did change, that is a separate agreement and should be documented as one. See Stripe retainer price changes for that separate situation.

Tell the client how to pay the new schedule

Once the schedule changes, the client needs to know how to pay it. Stripe's page is direct on this point: "Customers must return to the payment page to make subsequent payments" ( Stripe, Create invoice payment plans). A client who paid the deposit through the first link may assume the rest will arrive on its own. Based on Stripe's note, that assumption is wrong for later payments.

Write the message so it can stand alone. Include the new amount for each installment, the new due dates, and the payment link. Say plainly that the client will need to return to the link for each later payment, and ask them to reply if any date does not work. A short message does most of the work. For this firm, it might read:

> Your deposit is now $1,500, with $500 still to pay on it. The dates are unchanged. Reply if any date does not work for you.

Keep the message in writing so there is a record on both sides. A phone call can clear up a question, but it should be followed by the same details in an email or letter the client can keep.

Keep a record of the change

The record matters as much as the arithmetic. Keep the original schedule, the new schedule, the date the change was made, and the client's written agreement in the same file. If a question comes up later about why a payment was $500 instead of $1,000, the file should answer it without anyone reconstructing the history from memory.

Put each payment date and amount next to the installment it applies to. That makes the next change easier, because the first step in any future change is to check what has been paid. A schedule with a clear payment history is quick to change. One without it means rebuilding the history by hand before you can touch a single number.

Before you save and send

Run these checks in order, and stop at the first one that fails.

  • The total matches the signed engagement letter.
  • Every paid amount is unchanged and matches your payment history.
  • The due dates are in order, and none has passed without the client's written agreement.
  • The invoice uses a collection method Stripe supports for invoices, as described above.
  • The written message includes the new schedule and payment link.

If someone else in the firm handles billing, have them read the new schedule against the engagement letter before it goes out. A second reader catches the error that the first person stopped seeing. The check takes a few minutes and costs far less than a client question about a total that does not match.

The Stripe pages cover the mechanics. They do not cover your state's rules on client money, trust accounts, or advance payments. If the amounts you are moving count as client funds in your state, check those rules before you change any installment, not after. The arithmetic in this post is the easy part. If the total, the payments, and the message all agree, the schedule is ready to send.

Today, compare the current schedule with the payment history and signed engagement letter before making any edit.

Related guides: Bill-send checks: 6 items from Stripe, Odoo and Clockify · Evergreen retainer alerts: 5 low-balance settings.

Questions about changing installments

What remains open on an unpaid installment?

The full new installment amount remains open. Check that figure against the payment history before saving.

Does moving a due date change the fee?

Moving only a due date leaves the fee unchanged. Confirm that the revised date still fits the order of installments.